Know which build is late — and exactly why.

Status lives in spreadsheets, the missing part lives in someone's inbox, and the ship date lives in your head. AssemblyIQ puts every build, every stall and every on-order part on one screen.

Built for machine builders and assembly shops running several jobs at once.

Line status — todayUpdated 14:38
SPM-014 · Indexing table
Running
SPM-011 · Press cell
Stalled +2d
Waiting onbearing 6202-ZZ — 4 of 12 received, balance due Tue. RFQ sent to two vendors; one reply read and logged.
SPM-017 · Leak tester
QC hold
SPM-009 · Gantry loader
Shipped
● 3 on schedule1 stalled61 parts tracked

Illustrative data — the real screen reads from your BOM.

§01 The blind spot

You find out a build is late when the customer calls.

The parts were ordered. Someone chased the vendor. A bracket came in short and the technician moved to another job. None of that is written down in one place, so the delay only becomes visible at the end — when there's nothing left to do about it.

Every shop solves this with the same three tools: a spreadsheet that goes stale, an inbox only one person can read, and the memory of whoever has been there longest.

The information already exists. It's just scattered across a BOM, a mailbox, a store shelf and a technician's head — and never in the same place at the same time.

§02 What it does

Build & document

Turn a messy BOM into a procedure the floor can actually follow.

01

Method sheets that write themselves

Import the BOM, order the steps, and the assembly document generates — printable A4 and a colour-coded Excel that looks like a deliverable, not a dump.

02

Cautions before the step, not after

ESD, orientation, torque, lift aid — flagged ahead of the operation they apply to, where they still change what someone does.

03

Right screen for every role

Admin, manager, tech writer, technician, store-in-charge, viewer — each sees only their tabs. Check-in/out stops two people editing the same structure.

Procure & receive

Stop chasing vendors by hand, and know what actually arrived.

04

Quotes and lead times in one request

Tick several lines and send one combined RFQ per vendor. Replies are read automatically and land back on the right row.

05

A stores register the whole company shares

Inward, outward, transfers and returns — each with quantity, bin, time and the person who did it. Receiving a delivery updates the project's bin location and receiving status in the same action.

06

Technicians request a kit, not a part number

Pick a sub-assembly and request its materials. Stock is reserved on the spot, partial issues are allowed, and the shortage stays open until it's filled.

Check & cost

Catch the drawing error before it becomes a remake.

07

Drawing QC against the model

Pair a drawing with its STEP file and reconcile the callouts — missing dimensions and mismatches surface before the part is cut.

08

Should-cost from the geometry

Load an assembly, untick the bought-out branches, and get a manufacturing estimate calibrated against quotes you've actually received.

09

Every change carries an ECR

Add a part, remove one, or raise a quantity and the app asks which ECR it belongs to — so the history explains itself a year later.

§03 Getting started

Prove it on your own BOM first.

The free Workshop tier runs one build with no login and nothing leaving your browser. When it earns its place, move the whole shop onto it.